Uzbekistan

Construction project of Kuyu Mazar pumping station in Bukhara region – Uzbekistan

This project includes the detailed study and construction supervision of the pumping station. The study covers the technical aspects related to water resources management, hydrological, hydrogeological, socio-economic, agronomic and marketing aspects, as well as the design of the pumping station with a flow rate of 36 m3/s (129,600 m3/h) and the preparation of its tender documents.

This pumping station aims at replacing the two existing floating pumping stations to allow a continuity of water supply to the irrigated perimeters located downstream.

The execution of the works is spread over a total duration of 2 years.